Projects
- Over 464 miles of remote road grading, with over 60 miles of this being done with Dozers. (USFS)
- 12 miles of road reconstruction, and over 1300 l.f. of welded steel water line, all in a remote location (USFWS)
- 165 l.f. Utility Bridge, built to exacting vertical and horizontal design tolerances. (City of Paso Robles)
- Emergency construction of two potable water wells, piping, electrical etc. (Mission Hills Community Services District)
- Potable Water Treatment Plant upgrades, including four 250 HP, 2350 gpm pumps. (City of Lompoc)
- 6,880 l.f. of water (8” to 20”), 2,700 l.f. of sewer (8” – 15”), 2,900 l.f. of storm drain (18” to 60”)
(The Towbes Group Inc.)
- 20,000,000 btu / hour Landfill Gas Flare (The City of Santa Maria)
- 18,590 tons of Asphalt Paving (overlay and new section) (USFS)
- Many, many more. Please contact us to see if we can help you accomplish your mission.
Client Testimonials
"Working with Sansone over the past year has been a pleasure. Sansone has exhibited the responsiveness and thoroughness necessary to be considred a valued subcontractor."
Raytheon
HAVESTARE Program
Vandenberg AFB, CA
"Your leadership of the team that put in drive-around roads to avoid numerous electrical lines was superb. These paths dramatically reduced the effort required to make the alternate route a viable one. Our mission at Vandenberg AFB was capped by a highly successful launch of this key intelligence payload on December 2."
Walter J. Lauderdale, Lt Col, USAF
National Reconnaissance Office
|